It sits right on the banks of the Mississippi River, about 40 miles northwest of the Twin Cities. If you’ve ever driven past it on I-94, you’ve seen the massive concrete structure and the plume of water vapor rising into the sky. That’s the Monticello Nuclear Generating Plant. To most folks, it’s just a landmark. But for the Northstar State’s power grid, it's basically the heart of the whole operation.
Nuclear power is polarizing. People get nervous. They think about old movies or headlines from decades ago. But the reality on the ground in Monticello is way more technical and, honestly, a lot more interesting than most people realize. It’s a single-unit boiling water reactor (BWR) that has been chugging along since 1971. That is a long time.
Think about that. This plant started spliting atoms while Nixon was in office.
How the Monticello Nuclear Generating Plant Actually Works
Most people think nuclear plants are these magical, futuristic batteries. They aren't. They are just really fancy ways to boil water. At the Monticello Nuclear Generating Plant, Xcel Energy uses enriched uranium fuel to create a controlled fission chain reaction. This generates an incredible amount of heat. That heat boils water into steam, the steam spins a massive turbine, and that turbine creates electricity.
Simple, right? Not really.
The engineering required to keep that process stable for fifty years is staggering. Monticello uses a General Electric Type 3 boiling water reactor. It’s housed inside a Mark I containment system. This design is rugged. It’s built to withstand a lot. Unlike pressurized water reactors where the water in the core stays liquid, here the steam goes straight from the reactor vessel to the turbine. This makes it efficient but also means the maintenance team has to be top-tier because they're dealing with radioactive steam in the turbine building.
The plant produces about 671 megawatts of carbon-free electricity. In plain English? That is enough to power more than half a million homes. Without it, Minnesota’s goal of reaching 100% carbon-free energy by 2040 would basically be a pipe dream. You can't just replace that kind of "baseload" power with a few extra wind turbines. You'd need thousands of them.
The 2022 Tritium Leak: What Really Happened
You might remember the headlines from early 2023. News broke that the Monticello Nuclear Generating Plant had leaked about 400,000 gallons of water containing tritium. People freaked out. The delay in reporting the leak to the public—about four months—didn't help the optics.
Honestly, the communication was a mess. But the science was less scary.
📖 Related: Why the time on Fitbit is wrong and how to actually fix it
Tritium is a radioactive isotope of hydrogen. It occurs naturally in the environment and is a common byproduct of nuclear power. Xcel Energy found the leak in November 2022. It came from a pipe between two buildings. They contained it on-site. The Minnesota Department of Health and the MPCA (Minnesota Pollution Control Agency) both confirmed that the leaked water never reached the Mississippi River. It didn't get into the local drinking water.
If you drank a gallon of that leaked water? You'd get a dose of radiation roughly equivalent to eating a few bananas or flying on a cross-country jet. Radiation is everywhere. The problem wasn't the safety of the public; it was the trust. When you run a nuclear plant, you have to be an open book. When the public felt like they were kept in the dark, it sparked a massive debate about how long these aging plants should stay open.
The Fight to Keep Monticello Running Until 2050
The original license for the plant was only for 40 years. That would have seen it shut down in 2010. Obviously, that didn't happen. The Nuclear Regulatory Commission (NRC) granted a 20-year extension, pushing the expiration to 2030.
But Xcel Energy wants more.
They’ve applied for a second subsequent license renewal. If approved, the Monticello Nuclear Generating Plant will keep running until 2050. That would make it an 80-year-old plant. That sounds crazy, doesn't it? Running a massive industrial machine for eight decades?
It’s actually more common than you’d think. As long as you replace the components—the pumps, the valves, the electronics—the "bones" of the plant remain incredibly solid. The NRC doesn't just hand these extensions out like candy. They require massive safety reviews. Xcel has to prove that the reactor vessel itself isn't becoming too brittle from decades of neutron bombardment.
Why not just build a new one?
Money. It’s always money. Building a new nuclear plant in the U.S. is a financial nightmare. Just look at the Vogtle plant in Georgia. It cost billions over budget and took years longer than planned. It’s much cheaper to keep a well-maintained veteran like Monticello running than to start from scratch. Plus, the local community loves the tax base. The plant is a massive employer in Wright County. If it shuts down, the local economy takes a massive hit.
Safety Systems and the "What If" Scenarios
Nuclear safety isn't just about one big wall. It’s about layers. It's called "defense in depth."
👉 See also: Why Backgrounds Blue and Black are Taking Over Our Digital Screens
At Monticello, you’ve got the fuel pellets themselves. Then the metal cladding around the fuel. Then the massive steel reactor pressure vessel. Then the primary containment—that's the light-bulb-shaped steel structure. Finally, you have the secondary containment, which is the big square reactor building you see from the highway.
The plant has redundant cooling systems. If the power goes out, they have massive diesel generators. If the generators fail, they have batteries. If the batteries fail? They’ve implemented "FLEX" equipment after the Fukushima incident in Japan. This includes portable pumps and generators stored in hardened buildings that can be hooked up to the reactor in an emergency.
It’s about being ready for the "one-in-a-million" event.
The Nuclear Waste Elephant in the Room
We have to talk about the waste. It’s the one part of the nuclear story that nobody has a perfect answer for yet. Since there is no permanent national repository in the U.S. (thanks to the endless political gridlock over Yucca Mountain), the waste stays on-site.
At the Monticello Nuclear Generating Plant, used fuel is stored in two ways:
- The Spent Fuel Pool: This is a massive, steel-lined concrete pool filled with water. The water cools the fuel and blocks the radiation.
- Dry Cask Storage: Once the fuel is cool enough, it’s moved into "casks." These are massive concrete and steel canisters. They sit on a concrete pad outside.
They are incredibly boring to look at. They just sit there. They don't move, they don't make noise, and they are built to withstand a plane crash or a massive earthquake. But they are a temporary solution that has become permanent. Protesters and environmental groups often point to this as the biggest reason to move away from nuclear. They argue we're leaving a radioactive "gift" for future generations.
On the flip side, the carbon emissions from coal or gas plants are killing people now through climate change and air pollution. It’s a trade-off. Do you want managed waste in concrete bins, or unmanaged waste in the atmosphere?
Moving Forward: What This Means for You
Whether you love nuclear or hate it, the Monticello Nuclear Generating Plant isn't going anywhere soon. It’s too vital to the grid. If you live in the area or care about energy policy, here is what you should actually be watching:
✨ Don't miss: The iPhone 5c Release Date: What Most People Get Wrong
First, keep an eye on the NRC’s decision regarding the 2050 license extension. This will involve public hearings. If you have concerns, that is the place to voice them.
Second, watch the groundwater monitoring reports. After the 2022 leak, Xcel installed dozens of new monitoring wells. These reports are public. You can literally see the tritium levels dropping as they pump and treat the water.
Third, pay attention to your energy bill. The cost of maintaining an old nuclear plant is significant. Xcel often asks the Public Utilities Commission for rate increases to cover these upgrades.
Nuclear power is a bridge. It’s not perfect, but it’s a steady, powerful bridge to a future that doesn't rely on burning carbon. The folks at Monticello are basically the operators of a massive, 1970s-era time machine that is keeping the lights on in 2026.
To stay informed on the plant's status, you can check the NRC’s daily status reports. They list every "event" or "unusual occurrence" at every plant in the country. It’s a great way to see through the hype and look at the actual data. If there’s a pump failure or a small valve leak, it’ll be there. Transparency is the only way this technology works in a democracy.
The best thing you can do is educate yourself on the difference between "contamination" and "radiation." One is a material you can clean up; the other is energy that passes through you. Knowing the difference helps you understand why a leak on-site isn't necessarily a disaster for your backyard.
Stay curious about where your power comes from. When you flip that switch tonight, there is a very good chance the electrons hitting your lightbulb started their journey inside a reactor vessel in Wright County.